Service
Roof renovation: your roof sorted for decades in one go
A roof wears out slowly. Tiles become porous, the underlay weathers, lead cracks and one day a repair is no longer enough. During a roof renovation we replace the roof covering and restore everything underneath.

We tell you in advance what really has to be done, what is sensible to include and what can wait. That way you decide based on the condition of your roof, not on a sales pitch.
When is a renovation due?
- Leaks in several places, or leaks that keep coming back after a repair
- Tiles that are porous, crumbling or shifting in large numbers
- A sagging roof surface or visibly affected roof boarding
- An underlay or membrane that falls apart when touched
- A roof without insulation at a time when you want to make your home more sustainable
Approach
How we tackle it
Survey of the whole roof
We look at the roof covering, the underlay, the gutters, the lead work and the joints. You receive our findings with photos.
A proposal with options
The quote itemises demolition, structural repairs, insulation, roof covering, scaffolding and waste disposal. Where you have a choice, we explain the differences.
Work per roof section
We open the roof section by section and seal it watertight at the end of every working day. You can simply stay at home while we work.
Handover
We go over the result with you, tidy up the site and take the waste away. Any remarks are resolved before we leave.
Costs
What determines the price?
We do not quote amounts here: without a survey of your roof that would be guesswork. The quote itemises the costs, so you can see what the total is made up of.
Request a tailored quote- Surface area, pitch and shape of the roof
- Type of roof covering: clay tile, concrete tile, slate or bitumen
- The condition of the roof boarding, counter battens and tiling battens
- Whether the roof is insulated, and to what value
- Access and the scaffolding required
- Additional work on gutters, lead, roof windows or the chimney
Frequently asked questions
Questions about roof renovation
How long does a roof renovation take?
That depends on the size of the roof, the weather and whether it is being insulated. The roof of an average terraced house usually takes a few working days, a detached house longer. The schedule is in the quote.
Do I need a permit?
Usually not for replacing the roof covering with similar material. If the appearance changes, the roof becomes higher because of external insulation, or your home is a listed building, a permit may be required. You can check this in a few minutes on the Omgevingsloket, the Dutch government permit portal.
Is there a grant for roof insulation during a renovation?
There is a national grant scheme for roof insulation (ISDE). The conditions and amounts change regularly; the current scheme is on rvo.nl. If you want to apply, we take the requirements into account in the design.
Contact
Roof renovation: curious what your roof needs?
Tell us what is going on. We think along with you and, where needed, schedule a free roof inspection. A request is without obligation.
Emergency with a leak or storm damage?Rather have us call you?
Leave your number and we will get in touch.
Thank you, your request has been sent
We will call you back as soon as possible on the number you gave us.